Core Road Network Master Plan

UPPWD, Lucknow

  PDF Annexure set A Volume 1  
1 Annexure A-4.1a&b

2 Annexure A-4.2a&b

3 Annexure A-4.3a&b

  PDF Annexure set B Volume 2  
1 Annexure 7.1 EIRR & Phasing of Corridors & Roads

2 Annexure B-4.1 Network Attributes

3 Annexure B-4.2 FINAL_CRN_SH

4 Annexure B-4.3 FINAL_CRN_MDR

5 Annexure B-4.4 FINAL_CRN_ODR

6 Annexure B-5.1 part and 5.2-Calculation sheets-design, cost, rates, npv

7 Annexure B-5.1(a)-Dgn of cc pav, x-sec, NPV, cost 1

8 Annexure B-5.1(a)-Dgn of cc pav, x-sec, NPV, cost

9 Annexure B-6.1 Cost Estimate for CRN and Corridors
10 Annexure B-6.2 Pontoon Bridges to be replaced by RCC Bridges on Core
11 Annexure B-6.3 New RCC Bridges on SH MDR ODR+1 NEW
12 Annexure B-6.4 Length and Cost of ROBs
13 Annexure B-9.1 to 9.3 UPGRADATION 0F SH-MDR-ODR
14 Annexure B-9.4 ROBs in Upgradation Prog
15 Annexure_B-9.5_List_of_New_Bridges
16 Annexure_B-9.6_List_of_Pontoon_Bridges
  Vol. 1 Drawing  
1 Appendix7.1
2 Fig 3.5
  VOL.2 Drawing  
1 FIG 8.1 2014-17_Phasing UPPWD
2 FIG 8.2 Phasing of core network
3 fig4.6core network with habitations
4 fig4.7 Corridor
     
  Fig. 1.1 Study Meth Chart_SCRNMP
  FNL_SRNMP Vol 2_UPPWD_R2
  FNL_SRNMP_Vol 1_UPPWD_R1
     
  ESMF-UPCRNDP-Final
     
  CORE NETWORK - NH HIGHWAYS
  CORE NETWORK - STATE HIGHWAYS
  CORE NETWORK - MAJOR DISTRICT ROADS
  CORE NETWORK - OTHER DISTRICT ROADS